MHP Eco Energy continues to decarbonize its production
According to NPC Ukrenergo, in 2023, as a result of massive attacks on the Ukrainian power system, the loss of installed capacity increased to 27 GW. "From October-November, critical infrastructure will again be the key target of the enemy. But the problem is that the power system's safety margin is much smaller today than it was a year ago," said Oleksandr Dombrovsky, President of MHP Eco Energy.


